六盒联盟



      Water reuse project of haicang ecological garden

      Column:Sewage disposal Time:2019-07-24
      shared:

      image.png

      Control measures: the project adopts the contact oxidation process, the bath water, toilet, laundry, balcony, etc in after entering the slag pool and adjust the trap, the lift pump to contact oxidation pool, in the contact oxidation pool after full reaction, gravity wastewater to precipitation pool, by gravity separation out of clear water, after chemical phosphorus removal, disinfected into recycling pool. The process has the advantages of strong ability to adapt to hydraulic load variation, less sludge, easy maintenance and management




        XML地图